Find why the line stopped. Agents that read your plant data and draft the fix.

Line 3 unplanned stop Open in Drive Files Activity Share
You06:48

Line 3 stopped unplanned again. Is it the same root cause and which assets are trending toward failure?

Context06:48

Pulling sensor history and the maintenance log for line 3 and the upstream assets.

Line 3 unplanned stop
Done in 2 min 27 s
  1. Pull vibration + temp 30 days, 6 assets
  2. Detect degradation signature, bearing wear
  3. Cross-check maintenance log, overdue PM
  4. Rank assets by risk, 3 at risk
  5. Wrote wo-5521.docx, 24 KB
  6. Wrote at-risk-assets.xlsx, 24 KB
Wrote wo-5521.docx, 24 KB
wo-5521.docxworkspaces/b/line-3-unplanned-stopDoc · 24 KB
Wrote at-risk-assets.xlsx, 24 KB
at-risk-assets.xlsxworkspaces/b/line-3-unplanned-stopSheet · 24 KB
Context06:51

Same root cause: bearing degradation on the Line 3 gearbox, vibration up 3x over 30 days, PM overdue. Two more assets trending the same way. Work order drafted with the parts list.

wo-5521.docxwork orderat-risk-assets.xlsx3 assets
You06:58

Schedule the gearbox during the next planned downtime and reserve the parts.

Context06:58

Scheduled against the next planned window and drafted the parts reservation.

Schedule WO + reserve parts?
Books the work order in the CMMS and reserves the bearing kit.
ScheduleHold
Ask anything
CAuto
wo-5521.docx
Document

Line 3 unplanned stop

Sep 10, 2026 · Line 3 unplanned stop · Context

Same root cause: bearing degradation on the Line 3 gearbox, vibration up 3x over 30 days, PM overdue. Two more assets trending the same way. Work order drafted with the parts list.

Scheduled against the next planned window and drafted the parts reservation.

What was checked

Pull vibration + temp (30 days): 6 assets

Detect degradation signature: bearing wear

Cross-check maintenance log: overdue PM

Line 3 unplanned stop Files Share
You06:48

Line 3 stopped unplanned again. Is it the same root cause and which assets are trending toward failure?

Context06:48

Pulling sensor history and the maintenance log for line 3 and the upstream assets.

Line 3 unplanned stop
Done in 2 min 27 s
  1. Pull vibration + temp 30 days, 6 assets
  2. Detect degradation signature, bearing wear
  3. Cross-check maintenance log, overdue PM
  4. Rank assets by risk, 3 at risk
  5. Wrote wo-5521.docx, 24 KB
  6. Wrote at-risk-assets.xlsx, 24 KB
Wrote wo-5521.docx, 24 KB
wo-5521.docxworkspaces/b/line-3-unplanned-stopDoc · 24 KB
Wrote at-risk-assets.xlsx, 24 KB
at-risk-assets.xlsxworkspaces/b/line-3-unplanned-stopSheet · 24 KB
Context06:51

Same root cause: bearing degradation on the Line 3 gearbox, vibration up 3x over 30 days, PM overdue. Two more assets trending the same way. Work order drafted with the parts list.

wo-5521.docxwork orderat-risk-assets.xlsx3 assets
You06:58

Schedule the gearbox during the next planned downtime and reserve the parts.

Context06:58

Scheduled against the next planned window and drafted the parts reservation.

Schedule WO + reserve parts?
Books the work order in the CMMS and reserves the bearing kit.
ScheduleHold
Ask anything
CAuto

From the line to the loading dock. Pick your kind of operation.

Discrete manufacturing

Nonconformances written up, change orders routed with their impact, the line rebalanced.

  • Manufacturing engineering
  • Quality
  • Production

Files

2 items New
FiltersType People Modified Sort: Name
Brandt IndustrialLine 3 unplanned stop
NameWritten byForModifiedSize
wo-5521.docxContextAgentm. flores1h ago24 KB
at-risk-assets.xlsxContextAgentm. flores2h ago24 KB
task.mdContextm. flores1h ago3 KB

Files

2 items New
FiltersSort: Name
Brandt IndustrialLine 3 unplanned stop
NameForModified
wo-5521.docxm. flores1h ago
at-risk-assets.xlsxm. flores2h ago
task.mdm. flores1h ago

A failing asset, start to finish. Ask, trace, draft the work order.

plant-maintenanceReliability engineer traces a line stop to a degrading asset and schedules the fix.4
Messages FilesDetails
Today
m. flores06:48

@Context Line 3 stopped unplanned again. Is it the same root cause and which assets are trending toward failure?

Context06:48
Line 3 unplanned stop
Done in 2 min 27 s
Wrote wo-5521.docx, 24 KB
wo-5521.docxworkspaces/b/plant-maintenanceDoc · 24 KB
Wrote at-risk-assets.xlsx, 24 KB
at-risk-assets.xlsxworkspaces/b/plant-maintenanceSheet · 24 KB
2
Priya Natarajan06:58

Schedule the gearbox during the next planned downtime and reserve the parts.

Context06:58

Scheduled against the next planned window and drafted the parts reservation.

Send a message in #plant-maintenance
plant-maintenance4
Messages FilesDetails
Today
m. flores06:48

@Context Line 3 stopped unplanned again. Is it the same root cause and which assets are trending toward failure?

Context06:48
Line 3 unplanned stop
Done in 2 min 27 s
Wrote wo-5521.docx, 24 KB
wo-5521.docxworkspaces/b/plant-maintenanceDoc · 24 KB
Wrote at-risk-assets.xlsx, 24 KB
at-risk-assets.xlsxworkspaces/b/plant-maintenanceSheet · 24 KB
2
Priya Natarajan06:58

Schedule the gearbox during the next planned downtime and reserve the parts.

Context06:58

Scheduled against the next planned window and drafted the parts reservation.

Send a message in #plant-maintenance

Agents that improve on your work. Same model for four months; the context grew.

Measured in production at Qualcomm. Read the case study

Task pass rate, same model
23% → 98%
Workflows in production
1,600
Teams onboarded
85

Work agents run across the plant. From the floor to the close.

Agents read and draft. People act. What your OT security team asks first.

  • The asker's accessAn agent opens only what the person who asked can open.
  • Writes wait for a personSends and shared edits pause for an approval.
  • Every action loggedAppend-only, exportable to your archive.
  • Your cloudModel calls go only to endpoints you allow.
  • Amazon EKS
  • Azure AKS
  • On premises
  • Air-gapped

On request:SOC 2ISO 27001Pen test reportCAIQTrust center

Questions from security and compliance reviews.

Can Context run inside our plant network?

Yes. On premises, it runs on hardware you operate, inside the perimeter your security team already defends.

Can an agent act on our equipment?

No. Agents read data and draft work orders, and anything they write waits for a person's approval.

Does it connect to our historian and MES?

Not out of the box. Load exports into Drive or register an MCP server for them. SAP, ServiceNow and Snowflake connect from the catalog.

Can we see why the agent flagged an asset?

Yes. The run keeps the data it read, the steps it took and the files it wrote, so the next shift can review the call.

Your workflow, running in your environment.

Bring a workflow your team runs today and watch it run on your data, with your permissions.