Qualification report
Reliability results assembled into the qual report
How a run goes
The steps this agent takes, in order, and what each one leaves behind.
Reads the qualification plan and the lab results
Assembles the qualification report from stress test results such as HTOL, temperature cycling and ESD
Fills the report template and checks every criterion
Checks sample sizes, readout points and pass criteria against the qualification plan
Routes the draft to the reliability engineer for sign-off
Flags any stress leg that is incomplete or failed and drafts the disposition
Works in

Box, Confluence, Jira
What it does
- Assembles the qualification report from stress test results such as HTOL, temperature cycling and ESD
- Checks sample sizes, readout points and pass criteria against the qualification plan
- Flags any stress leg that is incomplete or failed and drafts the disposition
Connects to
Need it to work differently?
Every agent can be changed: the steps it takes, the systems it uses and who approves what.